Skip to main content

Research Repository

Advanced Search

A novel data-driven tighten-constraint method for wind-hydro hybrid power system to improve day-ahead plan performance in real-time operation

Lai, Chunyang; Kazemtabrizi, Behzad

A novel data-driven tighten-constraint method for wind-hydro hybrid power system to improve day-ahead plan performance in real-time operation Thumbnail


Authors



Citation

Lai, C., & Kazemtabrizi, B. (2024). A novel data-driven tighten-constraint method for wind-hydro hybrid power system to improve day-ahead plan performance in real-time operation. Applied Energy, 371, Article 123616. https://doi.org/10.1016/j.apenergy.2024.123616

Journal Article Type Article
Acceptance Date May 31, 2024
Online Publication Date Jun 14, 2024
Publication Date Oct 1, 2024
Deposit Date Jun 6, 2024
Publicly Available Date Jun 27, 2024
Journal Applied Energy
Print ISSN 0306-2619
Electronic ISSN 1872-9118
Publisher Elsevier
Peer Reviewed Peer Reviewed
Volume 371
Article Number 123616
DOI https://doi.org/10.1016/j.apenergy.2024.123616
Public URL https://durham-repository.worktribe.com/output/2474794
This output contributes to the following UN Sustainable Development Goals:

SDG 7 - Affordable and Clean Energy

Ensure access to affordable, reliable, sustainable and modern energy for all

Files





You might also like



Downloadable Citations