Skip to main content

Research Repository

Advanced Search

Regulatory and Financial Hurdles for the Installation of Energy Storage in UK Distribution Networks

Anuta, Oghenetejiri H.; Crossland, Andrew F.; Jones, Darren; Wade, Neal S.

Regulatory and Financial Hurdles for the Installation of Energy Storage in UK Distribution Networks Thumbnail


Authors

Oghenetejiri H. Anuta

Andrew F. Crossland

Darren Jones

Neal S. Wade



Abstract

This paper examines the feasibility of energy storage in in a low voltage distribution network to facilitate increased Distributed Generation (DG), and electricity demand. Modelling is used to quantify technical and financial benefits of storage over a 10 year period. Technical benefits are achieved through loss reduction, prevention of voltage rise and peak shaving. However, for energy storage to be financially feasible, all multi-stakeholder benefits need to be included in any investment strategy and regulation needs to be updated to foster energy storage adoption.

Citation

Anuta, O. H., Crossland, A. F., Jones, D., & Wade, N. S. (2012, May). Regulatory and Financial Hurdles for the Installation of Energy Storage in UK Distribution Networks. Presented at CIRED Workshop 2012: Integration of Renewables into the Distribution Grid, Lisbon, Portugal

Presentation Conference Type Conference Paper (published)
Conference Name CIRED Workshop 2012: Integration of Renewables into the Distribution Grid
Publication Date May 1, 2012
Deposit Date May 22, 2012
Publicly Available Date Jan 29, 2014
Publisher IET
Pages 1-4
Series Title Durham Energy Institute
Book Title CIRED 2012 workshop : integration of renewables into the distribution grid.
DOI https://doi.org/10.1049/cp.2012.0811
Public URL https://durham-repository.worktribe.com/output/1156732

Files




You might also like



Downloadable Citations