Simon Pirani
The Silvertown Tunnel is in a hole, so Stop Digging
Pirani, Simon
Authors
Citation
Pirani, S. (2020). The Silvertown Tunnel is in a hole, so Stop Digging. [No known commissioning body]
Report Type | Other |
---|---|
Publication Date | 2020 |
Deposit Date | Dec 8, 2021 |
Public URL | https://durham-repository.worktribe.com/output/1604083 |
Related Public URLs | https://transportactionnetwork.org.uk/new-report-urges-silvertown-tunnel-rethink/ |
Additional Information | Publisher: Transport Action Network Type: n/a Subtype: n/a |
You might also like
Socialism and Electricity: Renewables and Decentralisation Versus Nuclear
(2024)
Journal Article
Ukraine's energy policy and prospects for the gas sector
(2021)
Report
How energy was commodified and how it could be decommodified
(2021)
Preprint / Working Paper
Downloadable Citations
About Durham Research Online (DRO)
Administrator e-mail: dro.admin@durham.ac.uk
This application uses the following open-source libraries:
SheetJS Community Edition
Apache License Version 2.0 (http://www.apache.org/licenses/)
PDF.js
Apache License Version 2.0 (http://www.apache.org/licenses/)
Font Awesome
SIL OFL 1.1 (http://scripts.sil.org/OFL)
MIT License (http://opensource.org/licenses/mit-license.html)
CC BY 3.0 ( http://creativecommons.org/licenses/by/3.0/)
Powered by Worktribe © 2024
Advanced Search