Bridgland, D., Harding, P., Allen, P., Candy, I., Cherry, C., George, W., …Whittaker, J. (2013). An enhanced record of MIS 9 environments, geochronology and geoarchaeology: data from construction of the High Speed 1 (London–Channel Tunnel) rail-link and other recent investigations at Purfleet, Essex, UK. Proceedings of the Geologists' Association, 124(3), 417-476. https://doi.org/10.1016/j.pgeola.2012.03.006